top of page
![](https://static.wixstatic.com/media/c6e61a_a94753919e3343dd89453eb0bfcdba32~mv2.jpg/v1/fill/w_980,h_357,al_c,q_80,usm_0.66_1.00_0.01,enc_auto/c6e61a_a94753919e3343dd89453eb0bfcdba32~mv2.jpg)
Damac Tower
status:
location:
sector:
main contractor:
Completed 2018
London UK
Mixed Use
Multiplex
A 50 storey and 24 storey double tower, office, residential and retail project within the prestigious Nine Elms development London.
PAROC products installed to cold water services throughout.
Additionally, PAROC insulation mattress installed along with acoustic insulation product to the drainage pipework throughout.
bottom of page