top of page
![](https://static.wixstatic.com/media/c6e61a_c959b81ad31e40e0904ebe4c08afdb42~mv2.jpg/v1/fill/w_980,h_419,al_c,q_85,usm_0.66_1.00_0.01,enc_auto/c6e61a_c959b81ad31e40e0904ebe4c08afdb42~mv2.jpg)
City Tower
status:
location:
sector:
main contractor:
Completion Aug 2023
London UK
Residential
Multiplex
Complete fit-out of the 57 storey tower containing 334 residential apartments.
PAROC products installed to all M&E and domestic services throughout, along with acoustic insulation to the drainage system.
Raychem HWAT-R system for hot water services.
bottom of page